EX35 RWD V6-3.5L (VQ35HR) (2008)
VTL-45 Exploded View (Part 2)
Removal and Installation
REMOVAL
1. Remove heater & cooling unit assembly.
2. Remove mounting screws (A), and then remove heater pipe cover (1).
3. Remove mounting screws (B), and then remove foot duct (left) (2).
4. Slide heater core (3) to leftward (as shown in the figure).
INSTALLATION
Installation is basically the reverse order of removal.