FX35 RWD V6-3.5L (VQ35HR) (2010)
Shift Linkage: Service and Repair
7AT RE7R01B
Exploded View
CONTROL ROD
Exploded View
Removal and Installation
CONTROL ROD
Removal and Installation
REMOVAL
1. Shift the selector lever to "P" position.
2. Disconnect A/T shift selector and control rod. See: Shifter A/T/Service and Repair/7AT RE7R01B/A/T Shift Selector/Exploded View.
3. Remove manual lever from A/T assembly.
4. Remove control rod from manual lever.
INSTALLATION
Note the following, and install in the reverse order of removal.
CAUTION:
Apply multi-purpose grease on the pin surface (that slides after installing collar) of the tip of the control rod.
-
When installing control rod to A/T shift selector assembly, refer to "ADJUSTMENT". See: Adjustments/7AT RE7R01B.
Inspection
CONTROL ROD
Inspection
INSPECTION AFTER INSTALLATION
Check A/T positions after adjusting A/T positions. See: Adjustments/7AT RE7R01B.
ADJUSTMENT AFTER INSTALLATION
Adjust A/T positions. See: Adjustments/7AT RE7R01B.