infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Positive Crankcase Ventilation|Page 2893 > < Positive Crankcase Ventilation|Page 2891
Page 1
background image

Positive Crankcase Ventilation: Testing and Inspection
Power Supply and Ground Circuit

POWER SUPPLY AND GROUND CIRCUIT

Diagnosis Procedure

1.CHECK GROUND CONNECTION
1. Turn ignition switch OFF.
2. Check ground connection M95. Refer to "Ground Inspection" in See: Testing and Inspection/Initial Inspection and Diagnostic Overview/Circuit

Inspection.

Is the inspection result normal?
YES - GO TO 2.
NO - Repair or replace ground connection.
2.CHECK ECM GROUND CIRCUIT FOR OPEN AND SHORT
1. Disconnect ECM harness connector.
2. Check the continuity between ECM harness connector and ground.

3. Also check harness for short to power.
Is the inspection result normal?
YES - GO TO 4.
NO - GO TO 3.
3.DETECT MALFUNCTIONING PART
Check the following.
-

Harness connectors F103, M116

-

Harness for open or short between ECM and ground

- Repair open circuit or short to power in harness or connectors.
4.CHECK ECM POWER SUPPLY CIRCUIT-I
1. Reconnect ECM harness connector.
2. Turn ignition switch ON.
3. Check the voltage between ECM harness connector terminals.

Is the inspection result normal?
YES - GO TO 6.
NO - GO TO 5.
5.DETECT MALFUNCTIONING PART
Check the following.
-

Harness connectors E10, F10

-

Harness connectors F103, M116

-

IPDM E/R harness connector E7

-

10 A fuse (No. 44)

-

Harness for open or short between ECM and fuse

- Repair open circuit, short to ground or short to power in harness or connectors.
6.CHECK ECM POWER SUPPLY CIRCUIT-II
1. Turn ignition switch OFF and wait at least 10 seconds.
2. Check the voltage between ECM harness connector terminals as per the following.

Positive Crankcase Ventilation|Page 2893 > < Positive Crankcase Ventilation|Page 2891