G20 L4-2.0L (SR20DE) (1992)
Fig. 12 Camshaft Installation
14.
Install camshafts, camshaft brackets, oil tubes, and baffle plate. Position left camshaft key at about 12 o'clock and right camshaft key at about 10
o'clock, Fig. 12.
Fig. 13 Camshaft Bolt Tightening Sequence
Fig. 14 Camshaft Bolts A, B, C & D Tightening Sequence
15.
Torque camshaft bolts as follows:
a. Torque righthand camshaft bolts Nos. 9, 10, 1 and 8 (in that order) to 1.4 ft. lbs., Fig. 13.
b. Torque lefthand camshaft bolts Nos. 11, 12, 1 and 10 (in that order) to 1.4 ft. lbs., Fig. 13.
c. Torque all bolts in numerical order to 4.3 ft. lbs.
d. Torque all A, B and C type bolts, Fig. 14, to 6.7-8.7 ft. lbs. and type D bolts to 13-19 ft. lbs.
Fig. 15 Camshaft Sprockets Installation
16.
Install camshaft sprockets. Line up mating marks on timing chain with mating marks on camshaft sprockets, Fig. 15.