infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Timing Cover|Specifications|Page 3455 > < Timing Cover|Specifications|Page 3453
Page 8
background image

6. Install two mounting bolts in front of oil pan (upper) in numerical order as shown in the figure.

Tightening Torque: 15.7 - 18.6 Nm (1.6 - 1.9 kg-m, 12 - 13 ft. lbs.)

7. Install oil pan (lower). Refer to "OIL PAN AND OIL STRAINER". 
8. Install right and left intake valve timing control covers as follows:

a. Install seal rings in shaft grooves. 

b. Apply liquid gasket to the intake valve timing control covers. Use Genuine RTV Silicone Sealant or equivalent. Refer to "RECOMMENDED

CHEMICAL PRODUCTS AND SEALANTS".

c. Install collared O-ring in front timing chain case oil hole (left and right sides).
d. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain case with the holes to install intake

valve timing control covers.

e. Tighten bolts in numerical order as shown in the figure.

9. Install crankshaft pulley as follows:

a. Fix crankshaft using ring gear stopper [SST: KV10117700 (J-44716)].
b. Install crankshaft pulley, taking care not to damage front oil seal.

^

When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).

c. Tighten crankshaft pulley bolt.

Tightening Torque: 39.2 - 49.0 Nm (4.0 - 5.0 kg-m, 29 - 36 ft. lbs.)

Timing Cover|Specifications|Page 3455 > < Timing Cover|Specifications|Page 3453