infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 9964 > < Initial Inspection and Diagnostic Overview|Page 9962
Page 1
background image

Power Distribution Module: Scan Tool Testing and Procedures

Active Test

ACTIVE TEST

Operation Procedure

1. Touch "ACTIVE TEST" on "SELECT DIAG MODE" screen.
2. Touch item to be tested.
3. Touch "START", and confirm its operation.

4. Touch "STOP" while testing to stop the operation.

Data Monitor

DATA MONITOR

Operation Procedure

1. Touch "DATA MONITOR" on "SELECT MONITOR ITEM " screen.

2. Touch "ALL SIGNALS", "MAIN SIGNALS" or "SELECTION FROM MENU" on the "DATA MONITOR" screen.
3. Touch the required monitoring item on "SELECTION FROM MENU". In "ALL SIGNALS", all items are monitored. In "MAIN SIGNALS",

predetermined items are monitored.

4. Touch "START".
5. Touch "RECORD" while monitoring to record the status of the item being monitored. To stop recording, touch "STOP".

Initial Inspection and Diagnostic Overview|Page 9964 > < Initial Inspection and Diagnostic Overview|Page 9962