G35 Sedan 2WD V6-3.5L (VQ35DE) (2005)
Power Distribution Module: Scan Tool Testing and Procedures
Active Test
ACTIVE TEST
Operation Procedure
1. Touch "ACTIVE TEST" on "SELECT DIAG MODE" screen.
2. Touch item to be tested.
3. Touch "START", and confirm its operation.
4. Touch "STOP" while testing to stop the operation.
Data Monitor
DATA MONITOR
Operation Procedure
1. Touch "DATA MONITOR" on "SELECT MONITOR ITEM " screen.
2. Touch "ALL SIGNALS", "MAIN SIGNALS" or "SELECTION FROM MENU" on the "DATA MONITOR" screen.
3. Touch the required monitoring item on "SELECTION FROM MENU". In "ALL SIGNALS", all items are monitored. In "MAIN SIGNALS",
predetermined items are monitored.
4. Touch "START".
5. Touch "RECORD" while monitoring to record the status of the item being monitored. To stop recording, touch "STOP".