infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Control Arm|Front|Page 10617 > < Control Arm|Front
Page 2
background image

Measured value of spring scale: Less than 34.8 N (3.5 kgf, 7.8 lbs.) 

^

If it is outside the specified range, replace upper link assembly.

Rotating Torque Inspection 

^

Attach mounting nut to ball stud. Check that rotating torque is within specifications with a preload gauge (SST).
Standard value Rotating torque: Less than 2.0 Nm (0.20 kgf-m, 18 inch lbs.) 

^

If it is outside the specified range, replace upper link assembly.

Axial End Play Inspection 
^

Move tip of ball joint in axial direction to check for looseness.
Standard value Axial end play : 0 mm (0 inch) 

^

If it is outside the specified range, replace upper link assembly.

INSTALLATION 
^

Refer to Components for tightening torque. Install in the reverse order of removal.

NOTE:  Refer to component parts location and do not reuse non-reusable parts.

^

Perform final tightening of front suspension member installation position (rubber bushing) under unladen condition with tires on ground. Check
wheel alignment. Refer to SERVICE DATA.

Compression Rod

COMPRESSION ROD 

Removal and Installation 
REMOVAL 
1. Remove tire with power tool.
2. Remove undercover with power tool.
3. Remove cotter pin of compression rod ball joint, and loosen nut.
4. Use a ball joint remover (suitable tool) to remove compression rod from steering knuckle. Be careful not to damage ball joint boot.

CAUTION:  Tighten temporarily mounting nut to prevent damage to threads and to prevent ball joint remover (SST) from coming off.

5. Remove compression rod and compression rod stay from vehicle.

INSPECTION AFTER REMOVAL 
Visual Inspection 
^

Check compression rod and bushing for deformation, cracks, or damage. If any nonstandard condition is found, replace it.

^

Check boot of ball joint for cracks, or other damage, and also for grease leakage. If any nonstandard condition is found, replace it.

Ball Joint Inspection 
^

Manually move ball stud to confirm it moves smoothly with no binding.

Swing Torque Inspection 

NOTE:  Before measurement, move ball joint at least ten times by hand to check for smooth movement.

Control Arm|Front|Page 10617 > < Control Arm|Front