infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Procedures|Page 1699 > < Procedures|Page 1697
Page 18
background image

10. Install intake valve timing control covers as follows:

a. Install new seal rings (1) in shaft grooves.

A : Bank 2

CAUTION:
When replacing seal ring, replace all rings with new ones.

NOTE:
The figure shows an example of bank 2.

b. Install intake valve timing control cover with new gasket to front timing chain case.

CAUTION:
-

Align the center of both shaft holes of the shaft and the intake side camshaft sprocket, and then insert them.

-

Be careful not to drop the seal ring from the shaft groove.

c. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain case with dowel pin holes

(C) to install intake valve timing control covers.

A : Bank 1
B : Bank 2

d. Tighten mounting bolts in numerical order as shown in the figure.

-

After all bolts are tightened, tighten No.1 bolt to the specified torque again.

11. Install oil pan (lower). Refer to See: Engine Lubrication/Oil Pan/Service and Repair/Oil Pan (Lower)/Exploded View (2WD models) or See:

Engine Lubrication/Oil Pan/Service and Repair/Oil Pan (Lower)/Exploded View (AWD models).

12. Install rocker covers (bank 1 and bank 2). Refer to See: Powertrain Management/Ignition System/Ignition Coil/Service and Repair/Exploded View

.

13. Install crankshaft pulley as follows:

a. Fix crankshaft using the ring gear stopper [SST: KV10118600 (J-48641)].
b. Install crankshaft pulley, taking care not to damage front oil seal.

-

When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).
c. Tighten crankshaft pulley bolt.

Torque : 44.1 Nm (4.5 kg-m, 33 ft-lb)

Procedures|Page 1699 > < Procedures|Page 1697