J30t V6-2960cc 3.0L DOHC MFI (VG30DE) (1997)
Fuel Pump Control Module: Testing and Inspection
1. Start engine and warm it up sufficiently.
2. Turn ignition switch "OFF" and wait at least 5 seconds.
3. Start engine and let it idle.
4. Check voltage between terminals (1) and (2).
Within 30 seconds of starting engine: Approximately 0V
More than 30 seconds after starting engine: Approximately 4.2V
5. If NG, replace FPCM.