infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Removal and Replacement|Page 4736 > < Removal and Replacement|Page 4734
Page 4
background image

Grease amount 

RH side: 113 - 123 g (3.99 - 4.34 oz) 
LH side: 95 - 105 g (3.35 - 3.70 oz) 

8. Install boot securely into grooves (indicated by *marks) shown in the figure.

CAUTION: If grease adheres to the boot mounting surface (with *mark) on shaft and housing, boot may come off. Remove all grease
from the surface.
 

9. To prevent from deformation of the boot, adjust the boot installation length to the value shown below (L) by inserting a flat-bladed screwdriver or

similar tool into the inside of boot from the large diameter side of boot and discharging inside air.

Boot installation length (L) 

RH side: 158 mm (6.22 in) 
LH side: 150.9 - 152.9 mm (5.94 - 6.02 in) 

CAUTION:  
^

If the boot installation length is outside the standard, it may cause breakage in boot.

^

Be careful not to touch the inside of the boot with the tip of a flat-bladed screwdriver. 

10. Install new larger and smaller boot bands securely.

a.

For one-touch clamp band (LH side)

i.

Secure the large and small ends of boot with new boot bands as shown in the figure.

b.

For low profile type band (RH side)

i.

Put boot band in the groove on drive shaft boot. Then fit pawls (<=) into holes to temporary installation.

Removal and Replacement|Page 4736 > < Removal and Replacement|Page 4734