M45 V8-4.5L (VK45DE) (2006)
9. Remove power steering oil reservoir tank (1) from the bracket, engine coolant reservoir tank (2) and vacuum tank (3).
10. Remove the harness clips (A)
11. Remove alternator mounting bolts (B), using power tools.
12. Remove alternator assembly upward.
Alternator Pulley Inspection
Perform the following.
-
Make sure that alternator pulley does not rattle.
-
Make sure that alternator pulley nut is tight.
Alternator pulley nut Torque : 118 N-m (12.0 kg-m, 87 ft-lb)
Installation
Installation is the reverse order of removal.
CAUTION:
Be sure to tighten "B" terminal nut carefully.
-
Install alternator, and check tension of belt. Refer to "Checking Drive Belts".
-
For this model, the power generation voltage variable control system that controls the power generation voltage of the alternator has been adopted.
Therefore, the power generation voltage variable control system operation inspection should be performed after replacing the alternator, and then
make sure that the system operates normally. Refer to "Power Generation Voltage Variable Control System Operation Inspection".