M45 V8-4.5L (VK45DE) (2006)
Power Distribution Module: Testing and Inspection
PDU (Power Distribution Unit)
Work Flow
1. Check the symptom and customer's requests.
2. Understand outline of system. Refer to "System Description".
3. Confirm that Intelligent Key system operates normally.
Refer to "POWER DOOR LOCK SYSTEM".
4. Repair or replace any malfunctioning parts.
Refer to "Trouble Diagnosis Symptom Chart".
5. INSPECTION END
With Generic Scan Tool
Information is not supplied by the manufacturer.
CONSULT-II Basic Operation
CONSULT-II BASIC OPERATION
CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending
on control unit which carry out CAN communication.
1. With the ignition switch OFF, connect CONSULT-II and CONSULT-II CONVERTER to the data link connector, and then turn the ignition switch
ON.
2. Touch "START (NISSAN BASED VHCL)".