Q45 V8-4.5L (VK45DE) (2002)
4. Caulk tank in specified sequence with Tool.
Use pliers in the locations where Tool cannot be used.
5. Make sure that the rim is completely crimped down.
Standard height "H" : ............................................................................................................................................ 8.0 - 8.4 mm (0.315 - 0.331 inch)
6. Confirm that there is no leakage.
Refer to Inspection After Installation.
INSPECTION AFTER INSTALLATION
1. Apply pressure with Tool.
Specified pressure value: ............................................................................................................................. 157 kPa (1.57 bar, 1.6 kg/cm2, 23 psi)
WARNING: To prevent the risk of the hose coming undone while under pressure, securely fasten it down with a hose clamp. Attach a hose to
the oil cooler as well. (A/T model only)