Q45 V8-4.5L (VK45DE) (2002)
11. Remove the screws from heater & cooling unit.
12. Remove the heater & cooling unit.
INSTALLATION
Installation is the reverse order of removal. Note the following.
NOTE: When filling radiator with coolant, refer to "Changing Engine Coolant". Recharge the A/C system.