Q45 V8-4.5L (VK45DE) (2002)
3. Check air passage continuity and operation delay time under the following conditions.
Make sure new O-ring is installed properly.
4. Clean the air passage (Portion A to B ) of EVAP canister vent control valve using an air blower.
5. Perform Test No. 9 again.