infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Power Distribution Relay > < Headlight Connector - Replacement|Page 12398
Page 1
background image

Multiple Junction Connector: Service and Repair

SMJ INSTALLATION

To install SMJ, tighten bolts until orange "fulltight" mark appears and then retighten to specified torque as required.

Tightening Torque:  3 - 5 N.m (0.3 - 0.5 kg-m, 26 - 43 in-lb)

CAUTION:  Do not overtighten bolts, otherwise, they may be damaged.

Power Distribution Relay > < Headlight Connector - Replacement|Page 12398