infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Customer Interest: > < A/C Connection O-Rings - Information|Page 9371
Page 4
background image

CAUTION: 

When installing high pressure tubes (with flange connections) to their mating parts, make sure the flange is fully seated onto the mating part before
the securing bolt is installed and tightened (see Figure 4). If the securing bolt is installed and tightened before the tube flange is seated onto its mating
part, O-ring damage and leaks can result.

Customer Interest: > < A/C Connection O-Rings - Information|Page 9371