QX56 V8-5.6L (VK56DE) (2004)
^
Set the charger to a low charger rate (trickle charge).
CAUTION:
For steps 2 and 3, DO NOT connect the CONSULT-II A/C Power Supply (see Figure B).
2.
Press [SUB MODE] (see Figure C) then:
a.
From the listed items find and select [BATTERY CHARGE].
3.
Check the CONSULT-II's "Charger Input" reading (see Figure D).
NOTE:
^
"Battery Voltage" is the voltage level of CONSULT-II's battery.
^
"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)
CAUTION:
If the "Charger Input" is below 12 volts:
^
A list of items to check when "Charger Input" voltage is below 12V is contained in the "ECM Reprogramming For Infiniti Vehicles" general
procedure.
Step Three: Reprogram the Vehicle ECM
Step Four: "Wrap-up" After Reprogramming is Finished