infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Control Arm > < Ball Joint|Front|Page 11572
Page 4
background image

^

Measure the vertical end play using a suitable tool.

^

Check dust cover for damage. Replace it and the cover clamp if necessary.

NOTE:  Before checking the axial forces and end play, turn the lower ball joint at least 10 revolutions so that the ball joint is properly broken in. 

Vertical end play "C" : 0 mm (0 inch)

Control Arm > < Ball Joint|Front|Page 11572