isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Computers and Control Systems > < Valve Clearance|Specifications
Page 1
background image

Valve Clearance: Adjustments

Adjust valves with engine cold.

Fig. 11  Rocker arm tightening sequence

1. Bring No. 1 cylinder to top dead center (TDC) on compression stroke by turning crankshaft until crankshaft pulley is aligned with timing mark '0'.
2. Check rocker arm shaft bracket nuts for looseness. Using sequence shown in Fig. 19, torque rocker arm shaft brackets 1 through 8 to 16 ft. lbs.,

then brackets 9 and 10 to 6 ft. lbs.

3. Check for play in No. 1 intake and exhaust valve pushrods. If No. 1 cylinder pushrods are depressed, rotate crankshaft 360° to position No. 1

cylinder on compression stroke.

4. Adjust the following valves:

a. No. 1 intake and exhaust.
b. No. 2 intake.
c. No. 3 exhaust.

5. Rotate crankshaft 360° and adjust the following valves:

a. No. 2 exhaust.
b. No. 3 intake.
c. No. 4 intake and exhaust.

6. Install valve cover. Tighten to specifications.

Valve Clearance Specifications:

Intake .............................................................................................................................................................................................  0.008 ±.002 inches
Exhaust ..........................................................................................................................................................................................  0.008 ±.002 inches

Computers and Control Systems > < Valve Clearance|Specifications