isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Knock Sensor|Specifications|Page 1797
Page 8
background image

9. Install new distributor cap screws.

Tighten:
Tighten the screws to 2.4 N.m (21 lb in).

10. Connect the CMP sensor harness connector.
11. Connect the spark plug wires and the ignition coil wire.
12. Connect the negative battery cable.

Tune-up and Engine Performance Checks > < Knock Sensor|Specifications|Page 1797