isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Linear Shift Assembly Replacement|Page 3168 > < Linear Shift Assembly Replacement|Page 3166
Page 4
background image

Tighten
Tighten the hexagon flange head bolt to 18 Nm (14 ft. lbs.).  

6. Install the park lock cable assembly onto the support bracket for the gear shift lever assembly. 
7. Screw the 3 oval head 6-lobed socket tapping screws into the shift gate and park lock cable assembly. 

Tighten
Tighten the 3 oval head 6-lobed socket tapping screws to 6.5 Nm (58 inch lbs.).  

8. Install the shift lever clevis (1) into the support bracket for the gear shift lever assembly. 
9. Install the ball actuator assembly (2) onto the gear shift lever assembly. 

10. Install the hexagon flange head bolt into the gear shift lever assembly. 

Tighten
Tighten the hexagon flange head bolt to 18 Nm (14 ft. lbs.).  

11. In order to install the linear shift assembly as an assembly, proceed to the next step. 

12. Install the linear shift assembly and secure using 3 flat head 6 lobed socket tap screws. 

Tighten
Tighten the 3 flat head 6 lobed socket tap screws to 10 Nm (89 inch lbs.).  

Linear Shift Assembly Replacement|Page 3168 > < Linear Shift Assembly Replacement|Page 3166