Hombre S Space Cab 2WD V6-4.3L (2000)
5. Measure the torque required to rotate the pinion. Compare this with the torque recorded earlier. Continue to tighten and measure a little at a time
until the same preload is achieved.
6. Align the propeller shaft with the alignment marks made previously. Use J 8614-01 in order to hold the pinion flange.
7. Install the propeller shaft to the pinion flange.
8. Install the bolts and retainers.
^
Tighten the bolts to 45 Nm (33 ft. lbs.).