isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Driver Air Bag Assembly|Page 4123 > < Driver Air Bag Assembly|Page 4121
Page 4
background image

21. Cut two 6.1 M (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the passenger

deployment harness.

22. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
23. Twist together one end from each of the wires in order to short the wires.

24. Twist together one connector wire lead to one deployment wire.

25. Bend flat the twisted connection.
26. Secure and insulate the connection using electrical tape.

Driver Air Bag Assembly|Page 4123 > < Driver Air Bag Assembly|Page 4121