isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Starting System > < Gauge - Voltmeter Displays High or Low|Page 3365
Page 2
background image

1. Install the generator to the mounting bracket with the two generator mounting bolts.
2. Install the brace to the back of the generator with the bolt.
3. Install the brace nut to the exhaust manifold stud.

NOTICE:  Refer to Fastener Notice in Service Precautions.

4. Connect the generator BAT terminal wire. Make sure the insulating boot is covering the terminal nut.

4.1. Tighten the front generator bolt to 50 Nm (36 ft. lbs.).
4.2. Tighten the rear generator bolt 25 Nm (18 ft. lbs.).
4.3. Tighten the brace bolt 25 Nm (18 ft. lbs.).
4.4. Tighten the brace nut 30 Nm (22 ft. lbs.).
4.5. Tighten the nut on the generator BAT terminal to 8 Nm (71 inch lbs.)
.

5. Connect the voltage regulator connector.
6. Install the accessory drive belt. Refer to Drive Belt Replacement.
7. Connect the negative battery cable.

Starting System > < Gauge - Voltmeter Displays High or Low|Page 3365