Hombre XS Space Cab 2WD V6-4.3L (1998)
O-ring Seal,Spring,and Dowel Pin Installation
2. Lubricate new O-ring seal (30) with power steering fluid.
-
O-ring seal (30) into groove in sleeve assembly (31).
3. Dowel pin (32) into housing (6).
4. Pressure plate spring (28).
5. Lubricate new O-ring seal (17) with power steering fluid.
-
O-ring seal (17) into groove in pressure plate (18).
O-ring Seal And Pressure Plate Installation
6. Mark top of pressure plate (18) directly over dowel pin hole in plate. This will help line up hole with dowel pin (32) to ensure dowel pin and hole
in pressure plate engage properly.
-
Pressure plate (18).
7. Two pump ring dowel pins (20).
Rotor Installation
8. Pump rotor (22). Counterbore must face drive shaft end of housing (6).