isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Procedures|Page 17343 > < Procedures|Page 17341
Page 4
background image

*

When the inflator module deploys, the deployment fixture may jump about 30 cm (1 ft) vertically. This is a normal reaction of the
inflator module due to the force of the rapid expansion of gas inside the inflator module.

*

If you are deploying a dual stage inflator module with stage 1 already deployed, the fixture may not move and the noise may have
been reduced.

16. Clear the area of people.

17. Separate the 2 banana plugs on the SIR deployment harness that were shorted together earlier in the procedure.

18. Place a 12-volt minimum/2-amp minimum power source, such as a vehicle battery, near the shorted end of the harness.
19. Connect the SIR deployment harness wires to the power source. Deployment of the inflator module will occur when contact is made.

20. Disconnect the SIR deployment harness from the power source after the inflator module deploys.
21. If the inflator module did not deploy, disconnect the adapter and discontinue the procedure and contact the Technical Assistance Group.

If deployment was successful, proceed to the following steps.

Caution:  After deployment, the metal surfaces of the SIR component may be very hot. To help avoid a fire or personal injury:

*

Allow sufficient time for cooling before touching any metal surface of the SIR component.

*

Do not place the deployed SIR component near any flammable objects.

22. Seat one banana plug into the other in order to short the deployment harness leads.

23. Put on a pair of shop gloves.

Procedures|Page 17343 > < Procedures|Page 17341