isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Procedures|Page 17347 > < Procedures|Page 17345
Page 8
background image

23. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
24. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

25. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail air

bag deployment harness.

26. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
27. Twist together one end from each of the wires in order to short the wires.

28. Twist together one connector wire lead to one deployment wire.

29. Bend flat the twisted connection.
30. Secure and insulate the connection using electrical tape.

31. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
32. Connect the deployment harness to the yellow connector of the roof rail module.

Procedures|Page 17347 > < Procedures|Page 17345