isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Steering Wheel Module|Page 6726 > < Steering Wheel Module|Page 6724
Page 20
background image

50. Disconnect the yellow harness connector to the right roof rail air bag from the vehicle harness connector.

51. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
52. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

53. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail 

air bag deployment harness.

54. Strip 13 mm (0.5 in) of insulation from both ends of the wires.
55. Twist together one end from each of the wires in order to short the wires.

56. Twist together one connector wire lead to one deployment wire.

Steering Wheel Module|Page 6726 > < Steering Wheel Module|Page 6724