isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Generator Cable Replacement|Page 5333 > < Generator Cable Replacement
Page 2
background image

5. Reposition the protective boot (4) from the generator output BAT terminal (2) for access.
6. Remove the generator output BAT terminal nut (6) and disconnect the generator positive lead (5) from the generator.
7. Remove the generator positive cable (3) from the battery cables harness conduit.

INSTALLATION PROCEDURE

1. Insert the generator positive cable (3) into the battery cables harness conduit.
2. Connect the generator lead (5) to the generator and install the generator output BAT terminal nut (6).

Tighten the generator output BAT terminal nut to 20 N.m (15 lb ft).

NOTE:  Refer to Fastener Notice in Service Precautions.

3. Press the protective boot (4) on to the generator output BAT terminal (2).

Generator Cable Replacement|Page 5333 > < Generator Cable Replacement