isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Steering Wheel > < Steering Gear|Service and Repair
Page 2
background image

1.

Lubricate grooves in rack teeth, sliding face of pressure pad and piston sealing face, then install shaft assembly into steering housing.

2.

Install holder assembly, using protector tool No. J-33997-9 to protect gasket, then the retaining ring. Ensure distance between outside end of
holder assembly and tip end of rack shaft is approximately 2.68 inches.

3.

Adjust rack shaft and pinion backlash as follows:

a. Install seven shims (.14 inch) from repair kit into steering housing.
b. Install valve and valve housing assembly. Torque attaching bolts to 14.5-21.7 ft. lbs.
c. Measure and record clearance between steering housing and valve housing mating surfaces.
d. Remove valve and valve housing assembly, then remove shims equivalent in thickness to clearance measured in step c.
e. Coat valve housing sealing surface with suitable sealant, then install valve and valve housing assembly. Torque attaching bolts to 14.5-21.7 ft.

lbs.

4.

Install valve housing dust cover, then the pressure pad and pressure pad spring.

5.

Install adjusting plug and torque to 5.42 ft. lbs., then back off 30-35 degrees.

6.

Install adjusting plug locknut and torque to 43-54 ft. lbs. After torquing locknut, ensure rack shaft operates smoothly.

7.

Install tie rod assembly and torque to 58-72 ft. lbs.

8.

Install wire and clamps, then the oil pipe. Torque oil pipe fitting to 12 ft. lbs.

9.

Install air vent pipe.

Steering Wheel > < Steering Gear|Service and Repair