isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Integrated Control Unit <--> [General Module] > < Troubleshooting|Page 5790
Page 2
background image

Indicator Input Test-Testing Procedure

1.  Remove the gauge assembly.
2.  Disconnect the connectors from the gauge assembly.
3.  Inspect the connector and socket terminals to be sure they are all making good contact.

^  If the terminals are bent, loose, or corroded, repair them as necessary, and recheck the system.
^  If the terminals look OK, make the following input tests at the connectors.

If any test indicates a problem, find and correct the cause, then recheck the system.

If all the input tests prove OK, the printed circuit film must be faulty; replace it.

Integrated Control Unit <--> [General Module] > < Troubleshooting|Page 5790