isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

WOT Switch Test|Page 1287 > < WOT Switch Test
Page 1
background image

Wide Open Throttle Switch: Testing and Inspection
Fuel Cut-Off System

FUEL CUT-OFF SYSTEM 

Preparation: 

1. Start and warm up the engine thoroughly.
2. Turn the ignition switch to the "LOCK" position.
3. Disconnect wide open throttle switch harnesses at connector, insert a fused jumper wire into the idle terminal (upper), then make connections at

the connector with the wire pulled part way out.

Inspection: 

1. Keep engine running at 2,000 - 2,500 rpm.
2. Check to make certain engine speed lowers to approximately 1,250 rpm when battery voltage is applied to the wire extending from the idle

terminal.

NOTE:  Engine hunting may occur at the speed of 1,250 rpm or so, but it does not indicate an abnormal condition.

Fuel cut-off and reinjection are controlled by the throttle switch.

WOT Switch Test|Page 1287 > < WOT Switch Test