isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Power Trunk / Liftgate Lock Actuator > < Liftgate Window Glass|Specifications|Page 3562
Page 3
background image

3. When installing gas stay assembly (1), first install the gas stay onto the rear quarter panel with fixing screw (2) and fastener (3) and then attach the

gas stay upper end to the ball stud by spreading the retainer with screwdriver, etc. Gas stay assemblies for left and right sides differ from each
other (The letter (4) L (LH) or R (RH) is embossed on the gas stay assembly.)

4. When installing hatchgate striker assembly, first partially tighten the fixing screw and close the hatchgate and tailgate. Then fully tighten the fixing

screw with the condition that the striker fits the hatchgate lock assembly at the tailgate.

Make sure that clearance exists between hatchgate striker and lock assembly.

After installation, again make sure that the striker fits the lock assembly properly.

5. Tighten the nuts; hinge to body (LH and RH)

Torque: 6 N.m (52 lb in)

6. Tighten the screws; glass and hinge fix (LH and RH)

Torque: 6 N.m (52 lb in)

NOTE:  When installing the hinge to the body, exercise special care not to damage the body paint surface.

7. Tighten the hatchgate striker fixing screws.

Torque: 6 N.m (52 lb in)

Power Trunk / Liftgate Lock Actuator > < Liftgate Window Glass|Specifications|Page 3562