Rodeo Sport 2WD L4-2.2L (2002)
6. Remove the power steering unit.
4X2 model:
1. Remove the power steering unit from the crossmember.
Installation (4X2 Model)
1. Install power steering unit to crossmember.
Tighten fixing bolt to specified torque.
Torque: 116 Nm (85 ft. lbs.)
2. Connect the feed line and return line.
Torque: 25 Nm (18 ft. lbs.)
3. Install tie-rod end assembly to knuckle.
Torque: 118 Nm (87 ft. lbs.)
4.
a. Align the setting marks made at removal. Install the universal joint assembly to the transfer gear assembly.
Temporary tighten the universal joint bolt.
b. Install the universal joint assembly to the power steering unit assembly.
Temporary tighten the universal joint bolt.
c. Install the transfer gear assembly with the shim to frame.
Torque: 54 Nm (40 ft. lbs.)
d. Tighten the universal joint bolt to the specified torque.
Torque: 31 Nm (23 ft. lbs.)
5. Install the stone guard.
6. Bleed the system.
Installation (4X4 Model)
1. Install power steering unit to crossmember. Tighten fixing bolt to specified torque.
Torque: 116 Nm (85 ft. lbs.)
2. Install power steering unit with crossmember to frame by aligning the setting marks made when removing. Tighten crossmember mounting bolt to
specified torque.
Torque: 173 Nm (128 ft. lbs.)
3. Install lower control arm bolt.
4. Install torsion bar.
5. Connect the feed line and return line.
Torque: 25 Nm (18 ft. lbs.)
6. Install tie-rod end assembly to knuckle.
Torque: 118 Nm (87 ft. lbs.)
7.
a. Align the setting marks made at removal. Install the universal joint assembly to the transfer gear assembly.
Temporary tighten the universal joint bolt.
b. Install the universal joint assembly to the power steering unit assembly.
Temporary tighten the universal joint bolt.
c. Install the transfer gear assembly with the shim to frame.
Torque: 54 Nm (40 ft. lbs.)
d. Tighten the universal joint bolt to the specified torque.
Torque: 31 Nm (23 ft. lbs.)
8. Install the stone guard.
9. Bleed the system.