isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Ignition Switch Lock Cylinder|Diagrams|Page 1943
Page 5
background image

13. Install instrument panel lower cover, then install the engine hood opening lever.
14. Connect the yellow 2-way SRS connector located under the steering column.
15. Connect the battery "-" terminal cable.

Tune-up and Engine Performance Checks > < Ignition Switch Lock Cylinder|Diagrams|Page 1943