isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Canister Purge Volume Control Valve > < Canister Purge Control Valve|Locations
Page 1
background image

Canister Purge Solenoid: Service and Repair

REMOVAL PROCEDURE

1. Disconnect the negative battery cable.
2. Disconnect the electrical connector from the EVAP canister purge solenoid.

3. Disconnect the vacuum hoses from the EVAP canister purge solenoid.
4. Remove the EVAP canister purge solenoid retaining bolt from the common chamber.
5. Remove the EVAP canister purge solenoid.

INSTALLATION PROCEDURE

1. Install the EVAP canister purge solenoid on the upper intake manifold.
2. Install the EVAP canister purge solenoid retaining bolt.

Tighten
Tighten the bolts to 20 N.m (16 lb ft.).

3. Connect the vacuum hoses to the EVAP canister purge solenoid.

4. Connect the electrical connector to the EVAP canister purge solenoid.

Canister Purge Volume Control Valve > < Canister Purge Control Valve|Locations