isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Evaporator Core > < HVAC System - Unpleasant Odors When In Use|Page 4166
Page 2
background image

1. To install a new evaporator assembly, add 5Occ (1.7 fl.oz.) of new compressor oil to a new core.
2. Tighten the refrigerant outlet line to the specified torque.

Torque Nm (lb.ft) 25 (18) 

3. Tighten the refrigerant inlet line to the specified torque.

Torque Nm (lb.ft) 15 (11) 

4. 0-rings cannot be reused. Always replace with new ones.
5. Be sure to apply new compressor oil to the 0- rings when connecting lines.

Evaporator Core > < HVAC System - Unpleasant Odors When In Use|Page 4166