isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Ball Joint|Upper|Page 4428 > < Ball Joint|Upper
Page 2
background image

Inspection and Repair

Make necessary parts replacement if wear, damage, corrosion or any other abnormal conditions are found through inspection.
^

Inspect the lower end boot for damage or grease leak. Move the ball joint as shown in the figure to confirm its normal movement.

^

Inspect screw/taper area of ball for damage.

^

If any defects are found by the above inspections, replace the ball joint assembly with new one.

^

After moving the ball joint 4 or 5 times, attach nut then measure the preload. 
Starting torque: 0.5 - 3.2 Nm (0.4 - 2.4 ft. lbs.)
If the above limits specified are exceeded, replace the ball joint assembly.

Installation

1. Install upper ball joint.
2. Install bolt and nut, then tighten them to the specified torque. 

Torque: 57 Nm (42 ft. lbs.)

3. Install nut and cotter pin, then tighten the nut to the specified torque with just enough additional torque to align cotter pin holes. Install new cotter

pin. 
Torque: 98 Nm (72 ft. lbs.)

Ball Joint|Upper|Page 4428 > < Ball Joint|Upper