isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 32 > < Diagram Information and Instructions|Page 30
Page 7
background image

PCM Connectors and Terminals
REMOVAL PROCEDURE

1. Remove the connector terminal retainer.
2. Push the wire connected to the affected terminal through the connector face so that the terminal is exposed.
3. Service the terminal as necessary.

INSTALLATION PROCEDURE

1. Bend the tab on the connector to allow the terminal to be pulled into position within the connector.
2. Pull carefully on the wire to install the connector terminal retainer.

Twisted Leads

Twisted Leads

REMOVAL PROCEDURE

1. Locate the damaged wire.

2. Remove the insulation as required.

INSTALLATION PROCEDURE

1. Use splice clips and rosin core solder in order to splice the two wires together.

2. Cover the splice with tape in order to insulate it from the other wires.

3. Twist the wires as they were before starting this procedure.

4. Tape the wires with electrical tape. Hold in place.

Twisted Shielded Cable

Twisted Shielded Cable

REMOVAL PROCEDURE

1. Remove the outer jacket.

2. Unwrap the aluminum/mylar tape. Do not remove the mylar.
3. Untwist the conductors.

Diagram Information and Instructions|Page 32 > < Diagram Information and Instructions|Page 30