XF (X250) V8-4.2L (2009)
1. Install the front subframe.
2. NOTE: Left-hand shown, right-hand similar.
Install the special tool.
3. NOTE: Left-hand shown, right-hand similar.
Install the front subframe rear retaining bolt.
-
Tighten to 80 Nm + 240°.
4. Remove the special tool.
5. Install the front subframe front retaining bolt.
-
Tighten to 150 Nm + 240°.