XF (X250) V8-4.2L (2009)
6.
Locate wind deflector net retainer onto the datum pin. (Figure 4)
7.
Using a magnetic tool, install the two innermost Torx screws:
^
Tighten the Torx screws to 2 Nm +/- 0.2 Nm (1.5 lbf ft +/- 0.15 lbf ft). (Figure 4)
8.
Pull wind deflector net taut at both ends.
9.
Install the two outermost Torx screws.
^
Tighten the Torx screws to 2 Nm +/- 0.2 Nm (1.5 lbf ft +/- 0.15 lbf ft). (Figure 5)
10.
Ensure wind deflector net is not wavy.
11.
Fully close the roof opening panel.
ROOF OPENING PANEL MOTOR SYNCHRONIZATION (VIN R00019 - R31206)
CAUTION:
Ensure the parking brake is engaged while engine is running.
1.
Start engine.
2.
Ensure all electrical components are switched off.
3.
Raise engine speed to 1,500 RPM.
NOTE:
Global Technical Reference (GTR) lookup sequence is as follows:
GTR Home> NAS > XF > Service Information > 2009 > Workshop Manuals > 501: Body and Paint> 501-17: Roof Opening Panel
4.
Refer to Workshop Manual (GTR) Section 501-17: Roof Opening Panel (76.82.48) to perform the Roof Opening Panel Motor Synchronization
procedure.