XJ-12 (X300) V12-6.0L (1995)
5.
Push the mounting bracket down as far as it will go. Tighten the screws while holding the mounting bracket down as far as possible.
6.
Push the reservoir down into the mounting bracket and tighten the clamp bolt. The reservoir should now be seated as low as possible in the
mounting bracket.
7.
Reinstall the toolbox assembly.
NOTE:
When installing the toolbox assembly, ensure that the traction control primary cable is centered in the slot in the toolbox as shown in Technical
Bulletin 19.6-03.
WARRANTY INFORMATION: