jaguar Workshop Repair Guides

Jaguar XJ-6 (X300) Workshop Manual: L6-40L (AJ16)

Timing Chain Upper|Page 1445 > < Timing Chain Upper|Page 1443
Page 4
background image

tab washer.

-

Fit and tighten the first sprocket securing bolt. Do not lock over the tab washer at this stage.

-

Rotate the sprocket for access.

-

Fit and tighten the second sprocket securing bolt. Lock over the tab washer.

-

Rotate the sprocket for access.

-

Remove the dummy stud. Fit and tighten the third sprocket securing bolt. Lock over the tab washer.

-

Rotate the sprocket for access.

-

Re4ighten the first securing bolt. Lock over the tab washer.

-

Re-check the sprocket alignment.

-

Re-adjust as necessary.

-

Lubricate the new timing chain and position the chain over the auxiliary drive shaft and crankshaft sprocket.

-

Lubricate the oil pump drive chain.

-

Fit the drive chain to the oil pump sprocket.

-

Engage the drive chain to the crank sprocket.

-

Ensure that the drive chain ends are on the damper side of the sprockets.

-

Fit a new link to the drive chain (2 Fig. 1).

-

Fit and align a link plate to Service Tool JD 130 (1 Fig. 1). Ensure that the link and tool clamp holes are aligned. Fit the tool/link plate assembly to
the drive chain.

-

Fit the `E' gate (3 Fig. 1) to the tool and chain link. Ensure that the chain is central to the tool. Tighten the tool center bolt, fully seating the plate
on to the link.

-

Slacken off the tool center bolt.

-

Re-position the tool clamp (4 Fig. 1) away from the chain. Locate the link riveting head on to the clamp. Tighten the tool center bolt (finger tight,
then further 1/2 to 3/4 turn). Slacken off the tool center bolt. Remove the tightening bar.

-

Re-position the clamp away from the chain.

-

Re-position the `E' gate away from the tool I chain. Remove the tool retaining handle and remove the tool.

Timing Chain Upper|Page 1445 > < Timing Chain Upper|Page 1443