XJ-6 (X300) L6-4.0L (AJ16) (1996)
ECM tools required:
^
One Anti-static work mat, Part No. JAG 205/ST010
^
One PROM removal tool, Part No. JAG 999/ND
^
One TX 20 Torx Tamper-proof screw bit, JAG 20/TORX
CAUTION!
The following steps should only be carried out while working at an anti-static workstation (Illustration 1) and wearing a grounding wrist strap.
1.
Position the ECM on the anti-static work mat so that when facing the multi- plugs, the red multi-plug is at the upper right and the black multi-plug
to the lower left.
2.
Note the position of the top cover with its mounting tab to the ECM housing. Mark both the cover and the casing using a felt tip marker to assist
reassembly. Remove the four tamper resistant retaining screws of the top cover (the cover adjacent to the red multi-plug) using a Torx 20
Anti-Tamper screw bit.