XJ-S Convertible (XJ27) L6-4.0L (1996)
11.
Apply the PECUS label from the kit to the cover near the existing labels without covering them (Illustration 6).
12.
Install the ECM by reversing the removal procedures.
13.
Connect the battery and reset the vehicle clock.
14.
Start the vehicle and perform an adequate road test to verify proper engine operation. Only if a drivability complaint exists, use the PDU to check
the orientation of the oxygen sensors and to perform the engine setup.
PARTS INFORMATION
WARRANTY INFORMATION