XJ (X350) V8-4.2L (2005)
28. Connect the CKP sensor electrical connector.
29. Lower the vehicle.
30. Carry out the valve clearance check. See: Cylinder Head Assembly/Valve Clearance/Testing and Inspection
31. Install the engine front cover.
28. Connect the CKP sensor electrical connector.
29. Lower the vehicle.
30. Carry out the valve clearance check. See: Cylinder Head Assembly/Valve Clearance/Testing and Inspection
31. Install the engine front cover.