XJ (X350) V8-4.2L (2005)
7. Detach the A/C compressor return line.
-
Remove and discard the A/C compressor O-ring seal.
-
Cap the exposed port.
8. Detach the A/C compressor supply line.
-
Remove and discard the A/C compressor O-ring seal.
-
Cap the exposed port.
9. Remove the A/C compressor.
Installation
All vehicles
1. Install the A/C compressor.
-
Tighten to 25 Nm.
NOTE: Un-cap the exposed ports.
2. Install new A/C compressor O-ring seals.
-
Lubricate the new O-rings with A/C refrigerant oil.
3. Clean off any oil residue that may contain A/C system fluorescent dye.
4. Connect the A/C compressor supply line.
-
Tighten to 20 Nm.