jaguar Workshop Repair Guides

Jaguar Workshop Service and Repair Manuals

A/C - System Flushing Procedure After Compressor R & R|Page 6104 > < A/C - System Flushing Procedure After Compressor R & R|Page 6102
Page 5
background image

43.

Set blower to a minimum of 75% of the maximum blower performance.

44.

Set control panel to auto low or maximum or maximum cooling performance.

45.

Start engine and allow the engine speed to stabilize.

46.

With the A/C 'ON', allow the engine to run for two minutes continuously at compressor speed less than 1800 rpm.

Note: 

Refer to manufacturer's guidelines for detailed information on flushing equipment maintenance and filter change.

47.

After two minutes of compressor operation, the oil distribution in the A/C system is finalized.

Global Technical Reference (GTR) Workshop Manual Information:

Internet access: http://www.jaguartechinfo.com

Parts Information

Warranty Information

Disclaimer

A/C - System Flushing Procedure After Compressor R & R|Page 6104 > < A/C - System Flushing Procedure After Compressor R & R|Page 6102