XJ (X350) V8-4.2L (2005)
6. Install the fuel injection pump belt cover.
7. Install the secondary bulkhead center panel.
8. Connect the battery ground cable.
6. Install the fuel injection pump belt cover.
7. Install the secondary bulkhead center panel.
8. Connect the battery ground cable.